
Student System Consolidation Archives
The documents listed below are archived from the original implementation of the Student System Consolidation Project.
- Scope Documentation
- Includes dependencies, goals/objectives, background information, boundaries, and deliverables.
- SSC Beta Checklist
- A check list of things to do during beta testing.
- SSC Beta Test Plan
- This document is available to SSC Group 2 institutions to test Banner in the new environment.
- SSC GoLive Checklist
- A check list of things to do during and after the go live.
- DIMM chips
-
OIIT will provide two SecureDIMM/CF modules for the encrypted printing. If your institution requires additional modules, please contact Capella Technologies:
http://www.capellatech.com/pages/6.0.0.contact_us.html
For more information about the product please visit http://www.capellatech.com/pages/2.1.2.securedimm.html.
- Backup/Recovery Document
- Explains the backup and recovery process.
