Chapter 6: Preliminary Design
Page 6-0: Step by Step Procedures
Page 6-1 – 6-7: Preliminary Design
Chapter 6 Appendices
- Appendix 6 A Preliminary Design Requirements
- Appendix 6 B (Moved to Appendix 5 H)
- Appendix 6 C Final Check List of Utilities
- Appendix 6 D Board of Regents Criteria for Combined Environmental Site Assessments (ESA) and Georgia Environmental Policy Act (GEPA) Evaluations
- Appendix 6 E GEPA Forms and Procedure
- Appendix 6 F Architect's Budget Certificate and Form X : BOR Projects
- Appendix 6 G Architect's Budget Certificate - GSFIC Projects Form 4AU
- Appendix 6 H Preliminary Design Submittal Checklist
- Appendix 6 I Program Manager's Checklist and Recommended Meeting Agenda
- Appendix 6 J Requirements for Loose Equipment Selection and Specifications
- Form 494 - GSFIC Schedule of Loose Equipment
